You need a partner who operates on the same level of safety. Kodiak pulls the best practices from each industry to ensure we align with your level of safety.
Kodiak delivered the ability to pump 240 barrels per minute from a pond to a frac pad 14 miles away in 25 days. It was a six pump system with 42 miles of transfer. There is no limit to the project size that Kodiak can handle. At least we haven’t found one yet.
Going Above & Beyond
Municipal Project - Downtown Denver
This project has been a joint effort with EquipmentShare and involved fusing 1500ft of 12 inch hdpe along with five different laterals going into a trunk line with five pumps running simultaneously. Kodiak has taken this large project off our customers’ plate by providing the build and oversight of the pump watch and offering an unmatched level of professionalism. We care about our customers and we do our best to make them look great by staying on schedule, identifying needs beforehand and communicating well.
We get it done
Yellow Pine, Idaho - Gold Mine
This project entailed building a B-9 tank provided by Rain for Rent and fusing a poly line to transfer the water to the tank.
While most companies turn down projects like this due to the logistics difficulty of getting products and materials to desolate and remote areas, Kodiak says yes. And when we show up, we’re prepared to tackle whatever is needed. Since our employees were MSHA (Mine Safety and Health Administration) certified, our customer did not have to worry about being compliant with mining safety standards. When we show up we find a way to get it done so our customers can focus on their business.